How to connect the Beninca VN.MT20/MT40 engine to the eL17 controller

8

mar

How to connect the Beninca VN.MT20/MT40 engine to the eL17 controller

Connecting the Beninca VN.MT20/MT40 engine to the eL17 controller


Connecting the Beninca VN.MT20/MT40 engine to the controller eL17QV2 (producer ELDRIM) for three-phase 400V power supply, star motor configuration version Fig. 8 on the left (on the sixth page in the Beninca manual 01/2010 rev12.)

Connecting the eL17QV2 controller (manufacturer ELDRIM) to a single-phase 230V power supply, triangle motor configuration version, Fig. 8 on the right (page six in the Beninca manual 01/2010 rev12.).

To connect the Beninca VN.MT20/MT40 motor to the eL17 controller, please follow the instructions provided by the manufacturer. Here are the general steps for you to make this connection:

Preparation of tools and materials:

  • Screwdriver
  • Electric cables
  • Cable processing tools
  • Operating instructions for the VN.MT20/MT40 engine and eL17 controller

Power off:

  • Before starting any work, make sure the power is turned off to avoid the risk of electric shock.

Connecting the cables:

  • Identify terminals: Read the markings on the terminals on both the motor and controller. User manuals should include connection diagrams.
  • Connect the wires: Connect the cables according to the diagram provided by the manufacturer. Below is an example connection diagram, which may vary depending on the specific model and software version:
    • Connect the power cables (L and N) to the appropriate terminals on the eL17 controller.
    • Connect the cables from the VN.MT20/MT40 engine to the appropriate terminals in the eL17 controller. Most often, these will be terminals marked "MOTOR" and wires for endstops.
  1. Connecting accessories:
    • If you have additional accessories, such as photocells, control buttons or other safety devices, connect them in accordance with the eL17 controller user manual.
  2. Check connections:
    • Make sure all connections are secure and in accordance with the user manual.
    • Check whether the cables are properly secured to avoid mechanical damage.
  3. Power on and testing:
    • Turn on the power to test the system operation.
    • Make sure the gateway operates smoothly, without interruption and as expected.
  4. Calibration and programming:
    • If necessary, calibrate and program the eL17 controller in accordance with the operating instructions. This may include setting limit switches, opening/closing speeds and other operating parameters.

In case of difficulties or doubts, it is always worth contacting the manufacturer's technical service or commissioning the installation to a qualified specialist. Remember that proper connection and configuration are crucial for the safe and reliable operation of your gate automation system.